Incinerator Rated Capacity: 100/KG/Hr Type of Design: Double Chambered Mode of Heating: Heating Elements Primary Combustion Chamber Waste Charging Door: Provided with refractory lining with sealing gaskets Ash Removed Door: Provided with refractory lining with sealing gaskets Outer Body MOC: Mild Steel, 5mm Primary Chamber: Stainless Steel Operating Temperature :800. ± 50◦C Insulation: Insulation Brick Heating Elements Type: Kanthal Al Grade Power Consumption: 75 KW ( Initial Load ) Electrical Supply :3 Phase 440 Volt Control Panel MOC: Mild Steel Power Coated No. of Temp: Controllers : 2 Nos Details: The Control Panel will be provided with contract as relays , switches , indicators etc . Operative on 3 phase. I.D.Fan Type: Centrifugal Type MOC: Mild Steel Capacity:2 HP/3Phase Make of Motor: Kirloskar /Havells/Crompton Combustion Air Fan Type: Centrifugal Type Capacity: 1HP/3Phase Make of Motor: Kirloskar /Havells/Crompton Stack: Type: Wire Supported MOC: Mild Steel of ISstd Height :3 Meters or more
a complete destruction of waste from various hospital services
Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents. -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste. -Chemical waste laboratory reagents, disinfectants -Expired drugs. -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards -UL,CE, ASME, ISA EURO emission standard 1.Medical waste incinerator Construction – CS plate shells, FB reinforcement, cast refractory linings, Insulation and 14 gage aluminum jacket. Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50 – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber 1-clinker door in primary chamber 1-ash trolley access door in primary chamber 1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber 2- after burner in secondary chamber. Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan 1-secondary air fan Fuel storage tank – Capacity- 2500liter above ground – Material-6mm thick mild steel – 2-diesel pump, gate valve, safety valve, strainer Pipe, pressure gage, check valve, control board Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated Audio/ visual alarm system- burner lockout, overload fault Electrical accessories- primary and secondary chamber temperature …
La combustion à plateau ouvert l'emporte sur l'incinérateur fermé pour le propulseur M6 au Camp Minden
La première de nombreuses réunions publiques concernant l’élimination de plus de 15 millions de livres de propulseur M6 au Camp Minden a attiré près de 150 citoyens et fonctionnaires concernés au Minden Civic Center jeudi soir. Là, ils ont appris que l’accord conclu entre l’Environmental Protection Agency (EPA) et l’armée américaine, qui financera le nettoyage…
7. Тип отходов: биомедицинские / опасные / муниципальные / мусорные = ВСЕ и смешанные.
7. Тип отходов: биомедицинские / опасные / муниципальные / мусорные = ВСЕ и смешанные 8. Любое другое: резина, резиновые покрышки, аккумуляторы, зеленые отходы, бумага и картон. 9. Количество отходов, образующихся в день в кг: 3-5 тонн в день. 10. Продолжительность использования инсинератора C в день: 1 C 8 часов / 1 C 16 часов /…
Incineradores em Fiji
É uma ocorrência diária ver fumaça preta sendo emitida pelas chaminés do Hospital Memorial da Guerra Colonial em Suva. E na sequência de uma carta recente ao editor de Satish Nakched, o The Fiji Times prosseguiu com uma investigação sobre a fumaça que representa um obstáculo para os residentes próximos de Waimanu Road. Uma crença…
a complete destruction of waste from various hospital services
Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents. -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste. -Chemical waste laboratory reagents, disinfectants -Expired drugs. -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards -UL,CE, ASME, ISA EURO emission standard 1.Medical waste incinerator Construction – CS plate shells, FB reinforcement, cast refractory linings, Insulation and 14 gage aluminum jacket. Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50 – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber 1-clinker door in primary chamber 1-ash trolley access door in primary chamber 1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber 2- after burner in secondary chamber. Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan 1-secondary air fan Fuel storage tank – Capacity- 2500liter above ground – Material-6mm thick mild steel – 2-diesel pump, gate valve, safety valve, strainer Pipe, pressure gage, check valve, control board Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated Audio/ visual alarm system- burner lockout, overload fault Electrical accessories- primary and secondary chamber temperature …
incinerador de contrabando medi burn 30
retención de aire durante al menos 2 segundos a una temperatura inferior a 850C, la combustión Para lograr el efecto adecuado. ? debe ser un incinerador de dos cámaras, primario y secundario Estufas de combustible ? Los productos de desecho para reducir el volumen inicial Posible minimizar (aproximadamente un 5% de cenizas estériles Formulario). Finalidad:…
Hersteller von Müllverbrennungsanlagen in China
Brenngeschwindigkeit: 250 kg / h. Es sollte in der Lage sein, mindestens 10 Stunden pro Tag zu arbeiten Diese Verbrennungsanlage muss in der Lage sein, alle brennbaren Abfälle zu zerstören, die von Krankenhäusern, Privatkliniken, Labors, Instituten usw. erzeugt werden. Konstruktionsspezifikation: Typen A, B, C, D und E von medizinischen Abfällen “PYROLYTISCHE” Verbrennung durch Kontrolle der…
Incinerator Operating period Anticipated daily period 8 hours
Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating : at least 450kw/hour Burner: arranged for on/off operation Maximum consumption : at least 6litres per hour Average consumption : at least 3litres/hour After burner Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor. Maximum rating : At least 450kw/hour Burner: arranged for on/off operation Maximum consumption: at least 9 litres/hour Average consumption: at least 4.5 litres /hour Flue gas treatment Should have particulate remover (scrubbers) Electrical supply Single phase 220/240v a.c,50/60hz Documentation Operation manual 2 sets Service /maintenance manual 2 sets
Incinerator Operating period Anticipated daily period 8 hours
Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating : at least 450kw/hour Burner: arranged for on/off operation Maximum consumption : at least 6litres per hour Average consumption : at least 3litres/hour After burner Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor. Maximum rating : At least 450kw/hour Burner: arranged for on/off operation Maximum consumption: at least 9 litres/hour Average consumption: at least 4.5 litres /hour Flue gas treatment Should have particulate remover (scrubbers) Electrical supply Single phase 220/240v a.c,50/60hz Documentation Operation manual 2 sets Service /maintenance manual 2 sets